projects THIS IS INNER PAGE

Orchards 66, Edmonton

→ 170 Apartment Units
→ Coming in 2026
→ Apartment Complex in South Edmonton
Previous Next

Located the community of Orchards at Ellerslie this apartment complex features underground parking, surface parking, a gym, lounge area with kitchenette and work stations. Market value 50 million.

Orchards66.com

Shawnee Park, Calgary

→ 202 Apartment Units
→ Coming in 2026
→ Apartment Building in Calgary South
Previous Next

Shawnee Park Apartment Complex COMING in 2026 located in the established amenity rich community of Fish Creek in Calgary, Alberta. 202 units with one and two bedroom options. Includes gym, community room, dog wash station and rooftop patio. Market value 75 million

Livingston, Calgary

→ 230 Apartment Units
→ Coming in 2027
→ Apartment Building Complex
Previous Next

Currently in development phase. Apartment building complex will include underground and surface parking, a gym, lounge area with kitchenette and work stations, outdoor barbeque. Market value 80 million.

Kings Landing, Calgary

→ 135 Apartment Units
→ Completed in 2025
→ Apartment Building
Previous Next

This residential apartment investment property in central Calgary near Chinook Mall is planned for 135 suites with access to 97 parking stalls. The apartment building is planned as wood frame construction as a 6 storey building located in a central area with access to transit and main roads. Market value 52 million.

RentKingsLanding.com

Chappelle 28, Edmonton

→ 164 Apartment Units
→ Completed May 2024
→ Apartment Building in Chappelle Gardens
Previous Next

This large scale residential investment property in South Edmonton consists of one and two bedroom apartment suites with access to underground parking. The apartment complex is wood frame construction with an established land developer. 164 apartments over two 6 story buildings, 147 underground parking stalls, 83 surface parking stalls, gym, dog wash stations, tenant lounge, shared outdoor patio, daycare on a 2.75-acre site. Market value 46 million.

  • Building 1 completed Dec 2023, Building 2 completed May 2024

Learn more at Chappelle28.ca

Heritage Valley Townhomes, Edmonton

→ 128 Stacked Units
→ Completed Spring 2024
→ 2 and 3 Bedroom Townhomes
Previous Next

This residential development consists of 7 buildings, 128 stacked units offering stacked townhome-style suites with 160 surface parking stalls. Each unit features two floors of living space, with upper-level suites including a balcony. Dedicated surface parking is provided for residents, and air conditioning is available in select units. Completed Spring 2024. Market value 39 million.

 

Midfield Townhomes, Calgary

→ 90 Primary Suites, 90 Secondary Suites
→ Coming in 2027
→ Stacked Townhomes
Previous Next

The Calgary townhome complex will feature 90 primary suites and 90 secondary stacked suites. Garage parking available for 90 units. Market value is 63.5 million.

Midfield Apartments, Calgary

→ 89 Apartment Units
→ Coming in 2028
→ Apartment Building
Previous Next

Wood frame apartment building featuring 89 apartment units. There are 88 underground parking stalls, 12 surface parking stalls. Amenities include a rooftop patio and well connected walkways. Market value is 33 million.

Crown Park Apartments, Calgary

→ 172 Apartment Units
→ Coming in 2028
→ Apartment Building Complex
Previous Next

This two building apartment complex features 172 units with access to 174 underground parking stalls. Includes a coworking space, gym, lounge, BBQ pavilion and rooftop patio. Market value 60 million.

Cochrane Apartment, AB

→ 186 Apartment Units
→ Coming in 2030
→ Apartment Building
Previous Next

The wood frame apartment complex will feature 186 units, with access to 85 underground parking stalls and 200 surface stalls. Includes gym, lounge and coworking space. Market value 56 million.

Mahogany Multi Family, Calgary

→ 584 Apartment Units
→ Coming in 2031
→ Apartment Complex in Mahogany
Previous Next

This 3 building complex includes 584 apartment units. There will 593 underground parking stalls, 38 surface parking stalls, gym, jogging loop, tenant lounge, coworking space, dog run, playground, BBQ pavilion, sport courts and skating loop. Market value 257 million.